"Peter Eaton Wed, 21 Sep 2011 01:22:15
Thought it was a great 3 days, lots of different type trains and a big module display. Only suggestion is to have two separate power supplies for the two loops."
Peter Eaton wrote:
"Peter Eaton Wed, 21 Sep 2011 01:22:15 Thought it was a great 3 days, lots of different type trains and a big module display. Only suggestion is to have two separate power supplies for the two loops."
6 Comments
Webmaster
10/3/2011 12:02:03 pm
Have the flashing light place outside the greenhouse
Reply
Webmaster
10/3/2011 12:19:08 pm
Request the placement of the Portolet below the layout be moved to the left about 30 feet when viewed from the chairs at the top of the layout. This wwould improve the sight line from most pplaces on the layout
Reply
Asst. Conductor
10/9/2011 11:41:36 am
Got a great suntan!!! Seriously, would suggest a more formal work schedule to provide opportunities for all of VGRS to share the festivl in different time slots.
Reply
John M. Joy
10/9/2011 08:59:12 pm
Hi There,
Reply
Hans Irion
10/13/2011 12:33:00 am
1) put the bridge at the other end of the oval.
Reply
Here is a set of photographs of the team assembled on Tuesday November 8, 2011 to do the clean out requested above by JJ.
Reply
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
March 2013
Categories |