VGRS
  • Home
    • Buy, Sell, Swap, and Trade
    • About Us
    • Pin & Patches
    • Cross Buck Plans
  • Events
    • 2019 Events
    • 2018 Events
    • 2017 Events
    • Bach Yard Open House 2017
    • 2016 Events
    • 2015 Events
    • 2014 Events
    • 2013 Events
    • 2012 Events
  • Newsletter
  • Brochure
  • Gallery
  • Modules
  • Contact Us

Adams Farm 2011 - suggestions for improvement for next time

10/3/2011

6 Comments

 
Peter Eaton wrote:
"Peter Eaton                                                                                                                                                 Wed, 21 Sep 2011 01:22:15

Thought it was a great 3 days, lots of different type trains and a big module display. Only suggestion is to have two separate power supplies for the two loops."
6 Comments
Webmaster
10/3/2011 12:02:03 pm

Have the flashing light place outside the greenhouse

Reply
Webmaster
10/3/2011 12:19:08 pm

Request the placement of the Portolet below the layout be moved to the left about 30 feet when viewed from the chairs at the top of the layout. This wwould improve the sight line from most pplaces on the layout

https://picasaweb.google.com/lh/photo/9AGX8Klq2I8Ih2h1T50LeuN5GWivOLsorSg79GHV1Zo?feat=directlink

Reply
Asst. Conductor
10/9/2011 11:41:36 am

Got a great suntan!!! Seriously, would suggest a more formal work schedule to provide opportunities for all of VGRS to share the festivl in different time slots.

Reply
John M. Joy
10/9/2011 08:59:12 pm

Hi There,
I think we should clean out under the ends of the track so we can put the split jaws clamps on a little easiers.
Thanks, JJ

Reply
Hans Irion
10/13/2011 12:33:00 am

1) put the bridge at the other end of the oval.
2) make an entry sign so that all visitors are guided to
go around one way.
3) ask for benches to sit on and watch the trains.

Reply
Webmaster link
11/8/2011 10:01:58 pm

Here is a set of photographs of the team assembled on Tuesday November 8, 2011 to do the clean out requested above by JJ.

We were fortunate with the weather and were able to work outside.

All the end modules were done, including 2 straights, and a switch module.

Link in case above web link does not work:
https://picasaweb.google.com/118321802010926520159/ModuleGroupMeetsForModuleImprovementsFall2011?authkey=Gv1sRgCKe7yraKkc7b9QE

Reply



Leave a Reply.

    Author

    Write something about yourself. No need to be fancy, just an overview.

    Archives

    March 2013
    November 2011
    October 2011
    September 2011
    July 2011

    Categories

    All
    Activites
    Module Group
    Necr
    Randolph
    Vermont
    Vt

    RSS Feed